Learn moreZhuxikou Hydropower Project, P. R. China
Technology
Hydro
Renewables

Country
China
Asia

Standard
CDM
Compliance
Stage
Issuance
2011-10-17
Withdrawn
Total issued
324,487
tCO2
Annual Reduction
272,874
tCO2/year
CDM
Scope
| Energy industries |
Additionality
| Tool version : | 5 |
| Barrier analysis: | no |
| Investment analysis : | -Benchmark Analysis |
Provider ID
| UNEP | cdm2711 |
| UNFCCC | 2070 |
| Methodology | Ver | Description |
| ACM0002 | 6 | Grid-connected electricity generation for renewable sources (no biomass) |
| ACM0002 | 6 | Grid-connected electricity generation for renewable sources (no biomass) |
Description
Zhuxikou Hydropower Project, P. R. China (hereinafter referred to as the project) is located on the Zishui River in Anhua County, Hunan Province, P. R. China. The total installed capacity is 74MW with four generators, single capacity of which is 18.5MW 1 . The surface area at the full reservoir level of the project is 5.51 km2, so the power density of the project is 13.43 W/m2. The annual operation time is 3989 h. The annual electricity generation of the project is 295,200 MWh with a net power supply of 280,000 MWh per year to Central China Power Grid (CCPG), which is dominated by fossil fuel-fired power plants. It is estimated the annual emission reductions will be 272,874 tCO2e in the first crediting period.
The project contributes to the local sustainable development in the following aspects:
Providing the clean electric power. The project fits for the Chinese energy development goal. It can provide the clean electric power for the local residents to reduce the demand of fossil fuel and achieve greenhouse gas (GHG) emission reductions;
Promoting the local economic development. The project will promote the local development greatly
in the agriculture and service trade during the construction and operation period;
Improving the local infrastructure. The project owner would build roads and the electric transmission facilities, which will be helpful to improve the living condition of the local residents.
Technicals
Investment
$99M
Energy
| Installed capacity | 74 MW |
| Effective hours | 3.99k h/year |
| Energy generated | 295.00k MWh/year |
| Utilization ratio | 45.51 % |
| Activity start date | - |
Time
In validation
: Total elapsed days between “opening comments” and the registration request date.In registration
: Total elapsed days from registration request until approval.To be registered
: Total elapsed days from Validation until Registration approval (Validation + Registration).To first issuance
: Total elapsed days from registration approval until first credit issuance.Total to first issuance
: Sum of entire validation, registration and ‘to first issuance’ days; i.e. the entire process.
| In validation | 325 days |
| In registration | 165 days |
| To be registered | 490 days |
| To first issuance | 296 days |
| Total to first issuance | 784 days |
Location
6 Organizations (6 roles involvement)
![]() | Participant name | Carbon & Environment | Credit Buyer | () | Sweden | Contact name |
![]() | Participant name | Other | PDD Consultant | () | China | Contact name |
![]() | Participant name | Carbon & Environment | PDD Consultant | () | China | Contact name |
![]() | Participant name | Certification | Validator | () | Germany | Contact name |
![]() | Participant name | Certification | Verifier | () | Germany | Contact name |
![]() | Participant name | Carbon & Environment | Project Owner | () | China | Contact name |
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
Similar Projects
Ganluo Kaijianqiao Hydropower Project, P.R.ChinaCDM | China | Issuance
Update : 2013-02-14 12:42:39
Sandaowan Hydropower Project in Gansu Province, P.R. ChinaCDM | China | Issuance
Update : 2013-03-21 13:46:59
Shuanghekou 16.6MW Hydropower Project in Chongqing City, P.R. ChinaCDM | China | Stopped
Update : 2012-08-11 14:31:24
Hubei Yunlonghe Hydropower Project of Enshi City, Enshi Prefecture, Hubei Province, P.R. ChinaCDM | China | Issuance
Update : 2013-03-19 13:30:51
Luoning Yumenhe Hydropower Project in Henan Province, P.R.ChinaCDM | China | Issuance
Update : 2013-02-06 04:39:08