Learn moreZhejiang Dachen Island Wind Power Phase I Project
Technology
Wind
Renewables

Country
China
Asia

Standard
CDM
Compliance
Stage
Issuance
2012-03-23
CERs issued
Total issued
67,734
tCO2
Annual Reduction
52,087
tCO2/year
CDM
Scope
| Energy industries |
Additionality
| Tool version : | 5.2 |
| Barrier analysis: | no |
| Investment analysis : | -Benchmark Analysis |
Provider ID
| UNEP | cdm4885 |
| UNFCCC | 3133 |
| Methodology | Ver | Description |
| ACM0002 | 9 | Grid-connected electricity generation for renewable sources (no biomass) |
| ACM0002 | 10 | Grid-connected electricity generation for renewable sources (no biomass) |
Description
The Zhejiang Dachen Island Wind Power Phase I Project (hereafter referred to as the “Project”) developed by Zhejiang Xingxing Wind Power Co., Ltd (hereafter referred to as the “Project Developer”), is a grid-connected wind power plant in Taizhou City, Zhejiang Province in People’s Republic of China (hereafter referred to as the “Host Country”). The total installed capacity of the Project will be 25.5 MW, consisting of 34 turbines whose installed capacity is 750kW, with a predicted electricity supply to the grid of 56,530 MWh per annum1.
The purpose of the Project is to utilise a wind power facility to generate low greenhouse gas (GHG) emissions electricity for the East China Power Grid (hereafter referred to as the “Grid”). The Project Developer has obtained permission to sell generated electricity to the Zhejiang Power Grid which is an integral part of the East China Power Grid. The East China Power Grid is a coal-dominated power grid. The electricity currently generated by the grid is relatively carbon intensive, with an operating margin emission factor of 0.9540 tCO2/MWh and a build margin emission factor of 0.8236 tCO2/MWh (see section B for further details). The project is therefore expected to reduce emissions of GHG by an estimated 52,0872 tCO2e per year during the first crediting period by displacing electricity from the Grid. The baseline scenario is the same as the scenario existing prior to the start of the implementation of the project activity: electricity delivered to the Grid by the project would have otherwise been generated by the operation of grid-connected power plants and by the addition of new generation sources.
The project will contribute to the sustainable development of the Host Country. Specifically, the project:
• Achieves GHG emission reductions by avoiding CO2 emission from the business-as-usual scenario: electricity generation by he fossil fuel-fired power plants connected to the Grid.. • Increases employment opportunities in the area where the project is located (approximately 15 people will be permanently employed for the project operation3, and the construction of the project secures jobs in the construction sector) and thereby contributes to poverty alleviation. • Enhances the local investment environment and therefore improves the local economy. • Diversifies the sources of electricity generation. This is important for meeting growing energy demands and the transition away from diesel and coal-supplied electricity generation. • Makes greater use of renewable wind resources.
Technicals
Investment
$34M
Energy
| Installed capacity | 25.50 MW |
| Effective hours | 2.22k h/year |
| Energy generated | 56.53k MWh/year |
| Utilization ratio | 25.31 % |
| Activity start date | - |
Time
In validation
: Total elapsed days between “opening comments” and the registration request date.In registration
: Total elapsed days from registration request until approval.To be registered
: Total elapsed days from Validation until Registration approval (Validation + Registration).To first issuance
: Total elapsed days from registration approval until first credit issuance.Total to first issuance
: Sum of entire validation, registration and ‘to first issuance’ days; i.e. the entire process.
| In validation | 255 days |
| In registration | 216 days |
| To be registered | 471 days |
| To first issuance | 648 days |
| Total to first issuance | 1117 days |
Location
4 Organizations (5 roles involvement)
![]() | Participant name | Carbon & Environment | Credit Buyer | () | United Kingdom | Contact name |
![]() | Participant name | Carbon & Environment | PDD Consultant | () | United Kingdom | Contact name |
![]() | Participant name | Certification | Verifier | () | Japan | Contact name |
![]() | Participant name | Certification | Validator | () | Korea South | Contact name |
![]() | Participant name | Carbon & Environment | Project Owner | () | China | Contact name |
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
Similar Projects
Jilin Da’an Dagangzi Wind Power Project Phase IIICDM | China | Issuance
Update : 2013-03-07 14:38:12
CGN Inner Mongolia Huitengliang Phase I Wind Farm ProjectCDM | China | Issuance
Update : 2012-09-05 12:56:46
Huaneng Hailar Xiaoliang Phase I Wind Farm ProjectCDM | China | Issuance
Update : 2012-08-11 14:31:24
Huaneng Tongliao Zhurihe Phase I Wind Farm ProjectCDM | China | Issuance
Update : 2012-08-11 14:31:24
Xinjiang Dabancheng Sanchang Phase IV Wind Power ProjectCDM | China | Issuance
Update : 2013-01-11 22:47:19
Beijing Guanting Wind Power Project Phase II and Phase II additionCDM | China | Issuance
Update : 2013-01-02 18:54:57