Learn moreZhangjiagang Nature Gas Power Generation Project
Technology
Fuel Switch
Others

Country
China
Asia

Standard
CDM
Compliance
Stage
Issuance
2013-03-19
Awaiting scheduling
Total issued
1,971,263
tCO2
Annual Reduction
1,231,243
tCO2/year
CDM
Scope
| Energy industries |
Additionality
| Tool version : | 5 |
| Barrier analysis: | no |
| Investment analysis : | -Benchmark Analysis |
Provider ID
| UNEP | cdm2990 |
| UNFCCC | 2439 |
| Methodology | Ver | Description |
| AM0029 | 2 | Grid connected electricity generation plants using natural gas |
| AM0029 | 3 | Grid connected electricity generation plants using natural gas |
Description
Zhangjiagang Natural Gas Power Generation Project (hereinafter called as “the proposed project”) is to construct a greenfield natural gas fired grid-connected power plant in Zhangjiagang City in East China’s Jiangsu Province, and be invested, constructed and operated by Zhangjiagang Huaxing Power Co., Ltd. (hereinafter called as “Huaxing”).
The scenario existing prior the start of the implementation of the proposed project is that the electricity supply can not meet the electricity demand in Jiangsu province and meanwhile the peak regulation capacity of Jiangsu Power Grid (hereinafter called as “JPG”, JPG is the integral part of East China Power Grid, hereinafter called as “ECPG”) is insufficient.
The purpose of the proposed project is to construct a new thermal power plant using natural gas as fuel in order to supply electricity to JPG and increase the peak regulation capacity of JPG as well as lead to reduce the green house gas emissions. According to the FSR of the proposed project, the power generation technology is 9F-level gas-steam combined cycle, the rated total installation capacity is 780MW (2×390MW), the annual operation hours is 3500 hours, the annual natural gas consumption is estimated to be 576 million m3, the annual power generation is 2730 GWh and the annual net electricity output sent to the grid is 2675.4GWh.
According to the baseline scenario analysis described under section B.4 in this PDD, in the absence of the proposed project, the baseline scenario is to construct a new 600MW sub-critical coal fired power generation units. In comparison with the baseline coal-fired plant, the proposed project will lead to substantial greenhouse gas emissions reductions due to using the low-carbon intensive fuel and adopting the much higher efficient power generation technology. According to the ex-ante calculation in this PDD, the annual emission reductions of the proposed project are estimated to be 1,231,243 tCO2e, and the total emission reductions over the first crediting period are 8,618,701 tCO2e. The proposed project will not only meet the increase electricity demand of Jiangsu Province, but also improve the peak load regulating capability of JPG. Furthermore, the proposed project will also contribute to the sustainable development to local, global and the host country in a number of ways: – Lead to greenhouse gas emission reductions compared to a business as usual approach, thereby benefit the global climate change;
– Reduce other pollutants (e.g. SO2, NOx , dust, etc) compared to a business as usual approach, thereby improve the local environment quality;
– Enhance the ability of peak regulation to the local grid and improve the electric supply quality of the
Page3
CDM – Executive Board
– Promote the application of gas-fired combined cycle power generation technology widely in the East China Region.
– Create the employment opportunities for the local residents.
Technicals
Investment
$376M
Energy
| Installed capacity | 780 MW |
| Effective hours | 3.43k h/year |
| Energy generated | 2.68M MWh/year |
| Utilization ratio | 39.16 % |
| Activity start date | - |
Time
In validation
: Total elapsed days between “opening comments” and the registration request date.In registration
: Total elapsed days from registration request until approval.To be registered
: Total elapsed days from Validation until Registration approval (Validation + Registration).To first issuance
: Total elapsed days from registration approval until first credit issuance.Total to first issuance
: Sum of entire validation, registration and ‘to first issuance’ days; i.e. the entire process.
| In validation | 486 days |
| In registration | 173 days |
| To be registered | 659 days |
| To first issuance | 237 days |
| Total to first issuance | 894 days |
Location
6 Organizations (6 roles involvement)
![]() | Participant name | Carbon & Environment | Credit Buyer | () | China | Contact name |
![]() | Participant name | Carbon & Environment | PDD Consultant | () | China | Contact name |
![]() | Participant name | Certification | Verifier | () | United Kingdom | Contact name |
![]() | Participant name | Finance | Credit Buyer | () | Switzerland | Contact name |
![]() | Participant name | Certification | Validator | () | Norway | Contact name |
![]() | Participant name | Oil & Gas | Project Owner | () | China | Contact name |
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
Similar Projects
Sulige Natural Gas based Power Generation ProjectCDM | China | Issuance
Update : 2013-03-15 16:49:08
Yuyao Electricity Generation Project using Natural GasCDM | China | Issuance
Update : 2013-01-15 14:40:00
zhangjiagang nature gas power generation projectVCS | China | Issuance
Update : 2012-08-11 14:31:25
Beijing No.3 Thermal Power Plant Gas-Steam Combined Cycle Project Using Natural GasCDM | China | Issuance
Update : 2012-10-18 14:04:46
Nanjing Jinling Grid Connected Natural Gas Combined Cycle Power Plant ProjectCDM | China | Issuance
Update : 2013-03-15 05:44:16
Zhuhai Hongwan Natural Gas Power Generation ProjectCDM | China | Issuance
Update : 2012-08-11 14:31:24
Grid-connected Combined Cycle Power Plant of capacity 219.067 MW using Natural Gas/ R-LNG as fuels at Gujarat, India.CDM | India | Issuance
Update : 2012-09-17 07:27:06
Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power LimitedCDM | India | Issuance
Update : 2012-08-11 14:31:24
Hangzhou Huadian Banshan Power Generation Co., Ltd.’s Natural Gas Power Generation ProjectCDM | China | Issuance
Update : 2013-03-19 13:30:51