Learn moreYunnan Miaolin Hydropower Project
Technology
Hydro
Renewables

Country
China
Asia

Standard
CDM
Compliance
Stage
Issuance
2012-12-28
CERs issued
Total issued
237,366
tCO2
Annual Reduction
217,800
tCO2/year
CDM
Scope
| Energy industries |
Additionality
| Tool version : | 5.2 |
| Barrier analysis: | no |
| Investment analysis : | -Benchmark Analysis |
Provider ID
| UNEP | cdm4989 |
| UNFCCC | 3899 |
| Methodology | Ver | Description |
| ACM0002 | 9 | Grid-connected electricity generation for renewable sources (no biomass) |
| ACM0002 | 10 | Grid-connected electricity generation for renewable sources (no biomass) |
Description
The Yunnan Miaolin Hydropower Project (abbreviated as the “Project Activity” hereafter) is located in Zhongming Town and Tianxing Town, the territory between Daguan and Yiliang County within the jurisdiction of Zhaotong City, Yunnan Province. The Project Activity is developed and will be operated by Yiliang Dianneng Luoze River Basin Power Generation Limited (abbreviated as the “Project Entity”). The total installed capacity of the Project Activity will be 65 MW, with annual utilization of 4,290 hours, the theoretical annual electricity output will be 279 GWh, and 0.4% internal comsumption rate and 90% electricity coefficient are considered in the FSR, therefore, the annual electricity exported to the grid will be 250 GWh. The submerged area at normal reservoir level is 0.81 km2 giving the Project Activity a power density of approximately 80.25 W/m2.
The electricity generated by the Project Activity will be dispatched to the China Southern Power Grid (abbreviated as “the CSPG”). Under the scenario existing prior to the start of the Project Activity, electricity is supplied by the CSPG, it is also deemed as the baseline scenario. The electricity supplied by the Project Activity will displace electricity generated by power plants connected to the CSPG. Greenhouse gas (GHG) emission reductions will be achieved by displacing fossil fuel-dominated power generation attached to the CSPG. The estimated annual GHG emission reductions will be 217,800 tCO2e.
The Project Activity will contribute to the sustainable development of the host country and the local area by:
• Creating 30 employment opportunities;
• Creating additional access roads and infrastructure in a remote area where local communities have traditionally faced difficulties accessing these;
• Reducing GHG emission and other pollutants generated from the power industry by displacing electricity from carbon-intensive fossil fuel.
Technicals
Investment
$52M
Energy
| Installed capacity | 65 MW |
| Effective hours | 4.29k h/year |
| Energy generated | 279.00k MWh/year |
| Utilization ratio | 49.00 % |
| Activity start date | 2008-03-11 |
Time
In validation
: Total elapsed days between “opening comments” and the registration request date.In registration
: Total elapsed days from registration request until approval.To be registered
: Total elapsed days from Validation until Registration approval (Validation + Registration).To first issuance
: Total elapsed days from registration approval until first credit issuance.Total to first issuance
: Sum of entire validation, registration and ‘to first issuance’ days; i.e. the entire process.
| In validation | 600 days |
| In registration | 29 days |
| To be registered | 629 days |
| To first issuance | 430 days |
| Total to first issuance | 1057 days |
Location
5 Organizations (5 roles involvement)
![]() | Participant name | Consulting | PDD Consultant | () | China | Contact name |
![]() | Participant name | Carbon & Environment | Credit Buyer | () | United Kingdom | Contact name |
![]() | Participant name | Certification | Verifier | () | Germany | Contact name |
![]() | Participant name | Certification | Validator | () | Germany | Contact name |
![]() | Participant name | Carbon & Environment | Project Owner | () | China | Contact name |
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
Similar Projects
Zhenkang Quanqiaohe Hydropower Project in Yunnan ProvinceCDM | China | Issuance
Update : 2013-05-09 17:47:06
Zhenkang Fengweihe Hydropower Project in Yunnan ProvinceCDM | China | Issuance
Update : 2012-09-14 13:56:43
70MW Yunnan Dayingjiang 2nd Tier Hydropower ProjectCDM | China | Issuance
Update : 2013-05-19 06:53:50
Daguan Linguanyan Small Hydropower Project in Yunnan Province, P.R.ChinaCDM | China | Issuance
Update : 2012-08-11 14:31:24
Yunnan Zemahe 15MW Small Hydropower Project, P. R. ChinaCDM | China | Issuance
Update : 2012-08-11 14:31:24
Daguan Hongshayan 9.6 MW Small Hydropower Project in Yunnan Province, P.R.China.CDM | China | Issuance
Update : 2012-08-11 14:31:24