Learn moreNanjing Jinling Grid Connected Natural Gas Combined Cycle Power Plant Project
Technology
Fuel Switch
Others

Country
China
Asia

Standard
CDM
Compliance
Stage
Issuance
2013-03-15
Request For Issuance
Total issued
350,670
tCO2
Annual Reduction
1,044,328
tCO2/year
CDM
Scope
| Energy industries |
Additionality
| Tool version : | 5.2 |
| Barrier analysis: | no |
| Investment analysis : | -Benchmark Analysis |
Provider ID
| UNEP | cdm1299 |
| UNFCCC | 3008 |
| Methodology | Ver | Description |
| AM0029 | 6 | Grid connected electricity generation plants using natural gas |
| AM0029 | 3 | Grid connected electricity generation plants using natural gas |
Description
Nanjing Jinling Grid Connected Natural Gas Combined Cycle Power Plant Project (hereafter referred to as the “Proposed Project”) is a natural gas fired grid-connected electricity generation plant, constructed, owned and operated by Huaneng Nanjing Jinling Power Generation Co. Ltd (hereafter referred to as the ‘Project Owner’) in Jiangsu Province, China.
The total installed capacity of the Proposed Project is 780MW, and involves the installation of two sets of 390MW gas-steam combined cycle generation system. As a peak-load regulating power plant with an estimated annual operation of 3,500 hours, the Proposed Project will supply approximately 2,716,000 MWh of electricity per annum, to the Jiangsu Power Grid, a sub-grid of the East China Power Grid (ECPG). Each year approximately 576 million m3 of natural gas transmitted from the gas fields of the Chadamu basin of Qinghai, Tarim basin of Xinjiang, and Shanganning region in the west of China will be consumed by the Proposed Project.
As a newly constructed power plant, the scenario existing prior to the start of the Proposed Project was that an equivalent amount of electricity would have been obtained from the East China Power Grid.
As set out in section B.4., the appropriate baseline scenario for the Proposed Project is the construction of a new 600MW sub-critical coal-fired power plant. The Proposed Project activity, therefore, results in significantly lower GHG emissions compared with coal-fired power generation, calculated to be a reduction of approximately 1,044,328 tons of CO2e each year. During the first 7 year crediting period, the total emission reductions are 7,310,296 t CO2e.
Not only will the Proposed Project help in meeting the increased electricity demand requirements of Jiangsu Province, it will also contribute to the sustainable development of the local region and host country, as well as the domestic power industry in the following ways:
– reducing GHG emissions and other pollutants, including SOx, NOx and Carbon Dioxide, which are directly associated with the coal fired power plants that dominate the ECPG;
– demonstrating state-of-the-art, international natural gas combined cycle technology in the power industry in the PRC;
– improving the peak-load regulating capacity of the ECPG to support the alleviation of power shortages (‘brown-outs’) for end-users in a region with one of the highest population densities and levels of industrial activity in the PRC;
– creating employment opportunities for local residents; and
– supporting the sustainable development of the power industry in the PRC by promoting the CDM as a viable business opportunity to support investments in low-carbon technologies.
Technicals
Investment
$324M
Energy
| Installed capacity | 780 MW |
| Effective hours | 3.48k h/year |
| Energy generated | 2.72M MWh/year |
| Utilization ratio | 39.75 % |
| Activity start date | 2007-01-01 |
Time
In validation
: Total elapsed days between “opening comments” and the registration request date.In registration
: Total elapsed days from registration request until approval.To be registered
: Total elapsed days from Validation until Registration approval (Validation + Registration).To first issuance
: Total elapsed days from registration approval until first credit issuance.Total to first issuance
: Sum of entire validation, registration and ‘to first issuance’ days; i.e. the entire process.
| In validation | 1069 days |
| In registration | 310 days |
| To be registered | 1379 days |
| To first issuance | 247 days |
| Total to first issuance | 1624 days |
Location
5 Organizations (6 roles involvement)
![]() | Participant name | Oil & Gas | Credit Buyer | () | United Kingdom | Contact name |
![]() | Participant name | Oil & Gas | PDD Consultant | () | United Kingdom | Contact name |
![]() | Participant name | Certification | Verifier | () | United Kingdom | Contact name |
![]() | Participant name | Carbon & Environment | PDD Consultant | () | China | Contact name |
![]() | Participant name | Certification | Validator | () | Japan | Contact name |
![]() | Participant name | Utility | Project Owner | () | China | Contact name |
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
Similar Projects
Henan Zhengzhou Grid Connected Natural Gas Combined Cycle Power PlantCDM | China | Issuance
Update : 2013-03-15 05:44:16
Beijing No.3 Thermal Power Plant Gas-Steam Combined Cycle Project Using Natural GasCDM | China | Issuance
Update : 2012-10-18 14:04:46
Combined cycle natural gas based grid connected power plant at Jegurupadu, India.CDM | India | Issuance
Update : 2013-05-16 19:50:33
Grid-connected Combined Cycle Power Plant of capacity 219.067 MW using Natural Gas/ R-LNG as fuels at Gujarat, India.CDM | India | Issuance
Update : 2012-09-17 07:27:06
Shanghai Baoshan Grid Connected Natural Gas Combined Cycle Power Plant ProjectCDM | China | Issuance
Update : 2012-12-14 21:13:15
155 MW Gas based combined cycle power project at HaziraCDM | India | Issuance
Update : 2013-03-18 20:04:31
1147.5 MW Natural gas based grid connected Combined cycle power generation projectCDM | India | Issuance
Update : 2013-05-08 18:46:03
Grid connected 156.1 MW Combined Cycle Power plant at Hazira, GujaratCDM | India | Issuance
Update : 2013-05-17 16:09:44
Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power LimitedCDM | India | Issuance
Update : 2012-08-11 14:31:24