eCO2data is the world's biggest source of information and analytical tools for the carbon market. We provide unbiased information on the most carbon projects and participants.
Learn moreJiangxi Xingzi Daling Wind Farm Project
Technology
Wind
Renewables

Country
China
Asia

Standard
CDM
Compliance
Stage
Issuance
2012-06-15
CERs issued
Total issued
35,132
tCO2
Annual Reduction
37,614
tCO2/year
CDM
Scope
| Energy industries |
Additionality
| Tool version : | 5.2 |
| Barrier analysis: | yes |
| Investment analysis : | -Benchmark Analysis |
Provider ID
| UNEP | cdm5747 |
| UNFCCC | 3935 |
| Methodology | Ver | Description |
| ACM0002 | 10 | Grid-connected electricity generation for renewable sources (no biomass) |
| ACM0002 | 10 | Grid-connected electricity generation for renewable sources (no biomass) |
Description
Jiangxi Xingzi Daling Wind Farm Project (hereinafter referred to the proposed project) is located in Xingzi County of Jiujiang City in Jiangxi Province, China. The proposed project is a newly constructed project which will be constructed and operated by Jiangxi Zhongdiantou New Energies Co., Ltd.
Prior to the start of the implementation of the proposed project, local electricity service is provided by the Central China Power Grid which is dominated by fossil-fuel fired power. By utilizing wind sources, the proposed project will have a total installed capacity of 19.5MW (1.5MW×13) and contribute net power generation of 38,025MWh annually to Central China Power Grid through Jiangxi Grid.
The baseline scenario is the same as the scenario existing prior to the start of the implementation of the proposed project.
In Central China Power Grid, CO2 is the main greenhouse gas which is generated by fossil-fuel fired power plants. By utilizing clean and renewable wind sources, electricity generated by the proposed project will replace the same amount of electricity generated by Central China Power Grid which is dominated by fossil-fuel fired power. Therefore, no greenhouse gases are identified in the proposed project. As a result, greenhouse gas emission reduction of estimated 37,614tCO2e per year can be achieved.
The proposed will provide clean electricity to grid but also contribute to sustainable development of the host country by means of:
Providing reliable, zero-emitting renewable energy to Central China Power Grid Optimizing the power resource structure of grid and Stimulating to the local sustainable development Increasing the employment and income of local residents Driving the local industrial and agricultural production, and improving the living standard of local
residents
Reducing the emission of SOx, NOx and dust Stimulating the development of local tourism
Technicals
Investment
$28M
Energy
| Installed capacity | 19.50 MW |
| Effective hours | 1.95k h/year |
| Energy generated | 38.03k MWh/year |
| Utilization ratio | 22.26 % |
| Activity start date | 2009-06-10 |
Time
In validation
: Total elapsed days between “opening comments” and the registration request date.In registration
: Total elapsed days from registration request until approval.To be registered
: Total elapsed days from Validation until Registration approval (Validation + Registration).To first issuance
: Total elapsed days from registration approval until first credit issuance.Total to first issuance
: Sum of entire validation, registration and ‘to first issuance’ days; i.e. the entire process.
| In validation | 387 days |
| In registration | 29 days |
| To be registered | 416 days |
| To first issuance | 547 days |
| Total to first issuance | 961 days |
Location
5 Organizations (5 roles involvement)
![]() | Participant name | Carbon & Environment | Credit Buyer | () | United Kingdom | Contact name |
![]() | Participant name | Carbon & Environment | PDD Consultant | () | China | Contact name |
![]() | Participant name | Certification | Verifier | () | Germany | Contact name |
![]() | Participant name | Certification | Validator | () | Germany | Contact name |
![]() | Participant name | Industry | Project Owner | () | China | Contact name |
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
Similar Projects
Jilin Songyuan Changling Yaojingzi Wind Farm ProjectCDM | China | Issuance
Update : 2013-05-26 04:27:34
Hebei Chengde Weichang Yudaokou Pasture 150MW Wind Farm ProjectCDM | China | Issuance
Update : 2012-10-04 13:37:26
Huadian Gansu Guazhou Ganhekou No. 7 Wind Farm ProjectCDM | China | Issuance
Update : 2012-08-11 14:31:24




