eCO2data is the world's biggest source of information and analytical tools for the carbon market. We provide unbiased information on the most carbon projects and participants.
Learn moreJiangxi Taojiang Hydropower Project
Technology
Hydro
Renewables

Country
China
Asia

Standard
CDM
Compliance
Stage
Issuance
2012-12-21
CERs issued
Total issued
231,325
tCO2
Annual Reduction
71,780
tCO2/year
CDM
Scope
| Energy industries |
Additionality
| Tool version : | 4 |
| Barrier analysis: | no |
| Investment analysis : | -Benchmark Analysis |
Provider ID
| UNEP | cdm2626 |
| UNFCCC | 2039 |
| Methodology | Ver | Description |
| ACM0002 | 6 | Grid-connected electricity generation for renewable sources (no biomass) |
| ACM0002 | 6 | Grid-connected electricity generation for renewable sources (no biomass) |
Description
Jiangxi Taojiang (Fengkengkou) hydropower station (hereinafter referred as “the proposed project”) is located in Tieshi Town, Xinfeng County, Ganzhou City, Jiangxi Province. The total installed capacity is 25MW, and annual electricity generated is 77.9GWh. The flooded surface area is 1.58km2, and the power density is about 15.8W/m2. Generated electricity is delivered to Central China Power Grid through Power Grid of Xinfeng County and Ganzhou City. After the project is completed, electricity generated by the proposed project will effectively displace equal amount of the electricity generated by Central China Power Grid which is dominated by fossil fuel power plants, and thus greenhouse gas (GHG) emission reductions could be achieved. The estimated annual GHG emission reductions will be 71,780tCO2e.
The construction of the proposed project is in compliance with the choice of China energy industry’s priority areas1, and it will contribute to the sustainable development of the host party country and the local area through the following aspects:
The electricity shortage exists in Xinfeng County where the industry development started late. The power shortage has been strongly restricted the local industrial and agricultural development. The annual electricity generation will reach 77,900,000 kWh after Jiangxi Taojiang (Fengkengkou) Hydropower Station is completed, which will make positive impact on alleviating the contradiction between demand and supply of local electric power and create beneficial conditions to promote the industrial and agricultural development of Xinfeng county.
The implementation of the proposed project will provide development opportunity for local supportive industry, drive the development of relevant industry and local economy as well asolve local employment issue, which plays an active role in raising local residents’ living standard and promoting social economic development. The proposed project will displace part of the electricity generated by Central China Power Grid which is dominated by fossil fuel power plants; reduce coal consumption, environmental pollution and greenhouse gas emission caused by coal fire.
Technicals
Investment
$24M
Energy
| Installed capacity | 25 MW |
| Effective hours | 3.06k h/year |
| Energy generated | 76.50k MWh/year |
| Utilization ratio | 34.93 % |
| Activity start date | - |
Time
In validation
: Total elapsed days between “opening comments” and the registration request date.In registration
: Total elapsed days from registration request until approval.To be registered
: Total elapsed days from Validation until Registration approval (Validation + Registration).To first issuance
: Total elapsed days from registration approval until first credit issuance.Total to first issuance
: Sum of entire validation, registration and ‘to first issuance’ days; i.e. the entire process.
| In validation | 339 days |
| In registration | 270 days |
| To be registered | 609 days |
| To first issuance | 308 days |
| Total to first issuance | 915 days |
Location
5 Organizations (5 roles involvement)
![]() | Participant name | Certification | Verifier | () | United Kingdom | Contact name |
![]() | Participant name | Certification | Validator | () | Japan | Contact name |
![]() | Participant name | Finance | Credit Buyer | () | United Kingdom | Contact name |
![]() | Participant name | Other | PDD Consultant | () | China | Contact name |
![]() | Participant name | Carbon & Environment | Project Owner | () | China | Contact name |
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
Similar Projects
Jiangxi Xiuhe River Xiafang 36MW Hydropower Project in ChinaCDM | China | Issuance
Update : 2013-05-20 14:33:30





