Learn moreHongyan 8 MW Small-scale Hydro Project
Technology
Hydro
Renewables

Country
China
Asia

Standard
CDM
Compliance
Stage
Issuance
2013-03-08
Awaiting scheduling
Total issued
39,082
tCO2
Annual Reduction
23,290
tCO2/year
CDM
Scope
| Energy industries |
Additionality
| Tool version : | - |
| Barrier analysis: | yes |
| Investment analysis : | -Benchmark Analysis |
Provider ID
| UNEP | cdm1803 |
| UNFCCC | 1527 |
| Methodology | Ver | Description |
| AMS-I.D. | 10 | Grid connected renewable electricity generation |
| AMS-I.D. | 10 | Grid connected renewable electricity generation |
Description
The Hongyan 8 MW Small-scale Hydro Project (hereafter referred to as “the proposed project”) is a run-of-river project which is located in the southwest of Guizhou Province, China. The proposed project utilises the indraught hydrological resources from Dewo River, branch canal of Tangtang-river and Tuolun reservoir. It’s a small-scale hydro project mainly for zero-emission power generation. The total installed capacity of the proposed project is 8 MW(consisting of two 4 MW hydro turbines). It is estimated that approximately 29,530 MWh per annum electricity will be fed into the Guizhou Provincial Power Grid from the proposed project activity. Guizhou Provincial Power Grid is an integral part of China Southern Power Grid (CSPG). The electricity currently generated by the grid is relatively carbon intensive, with an operating margin emission factor of 1.0038tCO2/MWh and a build margin emission factor of 0.5736tCO2/MWh. Thus the proposed project activity will achieve 23,290 tCO2e greenhouse gas (GHG) reductions per year during the crediting period. As a renewable energy project to produce zero-emission green power to the grid, the proposed project can contribute to sustainable development of the local community, the host country and the world by means of:
To reduce GHG emissions compared to a business-as-usual scenario; To alleviate power shortage and stimulate economy development in the local area, which is one of the poorest areas in China; To reduce environmental pollutants emissions resulting from power generation industry in China Southern Power Grid compared to a business-as-usual scenario; To create new job opportunities for the local people. 93 job opportunities could be arranged in the construction period and 30 long-term job opportunities will be provided in the operation To supply ecological water to the downriver.
Technicals
Investment
$4M
Energy
| Installed capacity | 8 MW |
| Effective hours | 3.69k h/year |
| Energy generated | 29.53k MWh/year |
| Utilization ratio | 42.14 % |
| Activity start date | - |
Time
In validation
: Total elapsed days between “opening comments” and the registration request date.In registration
: Total elapsed days from registration request until approval.To be registered
: Total elapsed days from Validation until Registration approval (Validation + Registration).To first issuance
: Total elapsed days from registration approval until first credit issuance.Total to first issuance
: Sum of entire validation, registration and ‘to first issuance’ days; i.e. the entire process.
| In validation | 309 days |
| In registration | 83 days |
| To be registered | 392 days |
| To first issuance | 1017 days |
| Total to first issuance | 1407 days |
Location
5 Organizations (5 roles involvement)
![]() | Participant name | Certification | Verifier | () | China | Contact name |
![]() | Participant name | Finance | Credit Buyer | () | Japan | Contact name |
![]() | Participant name | Certification | Validator | () | Norway | Contact name |
![]() | Participant name | Carbon & Environment | PDD Consultant | () | Japan | Contact name |
![]() | Participant name | Carbon & Environment | Project Owner | () | China | Contact name |
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
Similar Projects
Sichuan Xiaohegou 12.6 MW Small-scale Hydro Power ProjectCDM | China | Issuance
Update : 2013-05-23 22:00:19
Zhejiang Wencheng Baiwanshan Small-Scale Hydropower ProjectCDM | China | Issuance
Update : 2012-08-11 14:31:24
Liujiashan 10 MW Small Hydropower Project in Jiangxi ProvinceCDM | China | Issuance
Update : 2013-02-08 03:39:54
Pingwu Renjiaba 12.6 MW Small Hydropower Project, P.R.ChinaCDM | China | Issuance
Update : 2012-12-11 18:15:18
Ranteballa Small-Scale Hydroelectric Power ProjectCDM | Indonesia | Issuance
Update : 2013-05-17 16:09:44
Gansu Diebu Niaojiaga 12.9 MW Hydropower Station ProjectCDM | China | Issuance
Update : 2013-02-26 17:47:45