eCO2data is the world's biggest source of information and analytical tools for the carbon market. We provide unbiased information on the most carbon projects and participants.
Learn moreHenan Zhengzhou Grid Connected Natural Gas Combined Cycle Power Plant
Technology
Fuel Switch
Others

Country
China
Asia

Standard
CDM
Compliance
Stage
Issuance
2013-03-15
Request For Issuance
Total issued
1,294,240
tCO2
Annual Reduction
691,502
tCO2/year
CDM
Scope
| Energy industries |
Additionality
| Tool version : | 3 |
| Barrier analysis: | yes |
| Investment analysis : | -Benchmark Analysis |
Provider ID
| UNEP | cdm1702 |
| UNFCCC | 1304 |
| Methodology | Ver | Description |
| AM0029 | 10 | Grid connected electricity generation plants using natural gas |
| ACM0002 | 6 | Grid-connected electricity generation for renewable sources (no biomass) |
| AM0029 | Grid connected electricity generation plants using natural gas |
Description
>>
Henan Zhengzhou Grid Connected Natural Gas Combined Cycle Power Plant (the “Project”, or the “proposed project”) is situated in the Zhengzhou City of Henan Province, and it is to be built as a grid- connected electricity generation plant using natural gas (NG) exploited from the gas fields in the Chadamu basin of Qinghai, Tarim basin of Xinjiang, and Shanganning region in the western areas of China.
Serving as a peak load balancing power plant, the proposed project has an annual installation capacity of 780 MW by 2×390 MW gas/steam turbines using combined cycle technology, running 3500h with a net electricity generation about 2598GWh to be sold into the Henan Grid, a sub-grid of an independent regional grid - Central China Grid (CCG), while an annual NG consumption of 525 million m3 is to be supplied on a firm basis according to a Fuel Supply Agreement signed.
The Project activity will result in a greenhouse gas (GHG) emission reductions about 691,502tons CO2 equivalent annually, in a 7x3 years of crediting period, resulting from the coal-dominated business-as- usual scenario in the CCG.
The Project will not only act as clean technology demonstration project, supply electricity to the grid, bring much better electricity peak load balancing efficiency, but also promote sustainable development of the host country and local area by means of: – Creating new job opportunities directly at the Project site during construction and operation, and indirectly at the pipeline construction and management of gas flow to the Project; – Improving people’s living standard;
– Reducing greenhouse gas emissions compared with the business-as-usual scenario; – Reducing other pollutants compared with the power generation in business-as-usual scenario; – Demonstrating a model project for the dissemination of more environmental friendly technology in power generation field where population condensed metropolitan cities are in great need in China; – Improving the structure and peak load balancing function of the local grid; and – Using NG transmitted by the national WEST to EAST natural gas program for supporting the development in the western areas of China.
CDM – Executive Board
Technicals
Investment
$311M
Energy
| Installed capacity | 780 MW |
| Effective hours | 3.33k h/year |
| Energy generated | 2.60M MWh/year |
| Utilization ratio | 38.02 % |
| Activity start date | - |
Time
In validation
: Total elapsed days between “opening comments” and the registration request date.In registration
: Total elapsed days from registration request until approval.To be registered
: Total elapsed days from Validation until Registration approval (Validation + Registration).To first issuance
: Total elapsed days from registration approval until first credit issuance.Total to first issuance
: Sum of entire validation, registration and ‘to first issuance’ days; i.e. the entire process.
| In validation | 183 days |
| In registration | 183 days |
| To be registered | 366 days |
| To first issuance | 470 days |
| Total to first issuance | 834 days |
Location
6 Organizations (6 roles involvement)
![]() | Participant name | Certification | Verifier | () | United Kingdom | Contact name |
![]() | Participant name | Certification | Verifier | () | United Kingdom | Contact name |
![]() | Participant name | Finance | Credit Buyer | () | United Kingdom | Contact name |
![]() | Participant name | Carbon & Environment | Project Owner | () | China | Contact name |
![]() | Participant name | Carbon & Environment | PDD Consultant | () | China | Contact name |
![]() | Participant name | Certification | Validator | () | Japan | Contact name |
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
Similar Projects
Nanjing Jinling Grid Connected Natural Gas Combined Cycle Power Plant ProjectCDM | China | Issuance
Update : 2013-03-15 05:44:16
Beijing No.3 Thermal Power Plant Gas-Steam Combined Cycle Project Using Natural GasCDM | China | Issuance
Update : 2012-10-18 14:04:46
henan zhengzhou grid connected natural gas combined cycle power plantVCS | China | Issuance
Update : 2012-08-11 14:31:25
Shanghai Baoshan Grid Connected Natural Gas Combined Cycle Power Plant ProjectCDM | China | Issuance
Update : 2012-12-14 21:13:15
Grid-connected Combined Cycle Power Plant of capacity 219.067 MW using Natural Gas/ R-LNG as fuels at Gujarat, India.CDM | India | Issuance
Update : 2012-09-17 07:27:06
Combined cycle natural gas based grid connected power plant at Jegurupadu, India.CDM | India | Issuance
Update : 2013-05-16 19:50:33
155 MW Gas based combined cycle power project at HaziraCDM | India | Issuance
Update : 2013-03-18 20:04:31
1147.5 MW Natural gas based grid connected Combined cycle power generation projectCDM | India | Issuance
Update : 2013-05-08 18:46:03
Sulige Natural Gas based Power Generation ProjectCDM | China | Issuance
Update : 2013-03-15 16:49:08
Guangzhou Zhujiang Power Plant Gas (LNG) Combined Cycle ProjectCDM | China | Issuance
Update : 2013-05-20 04:59:34




