eCO2data is the world's biggest source of information and analytical tools for the carbon market. We provide unbiased information on the most carbon projects and participants.
Learn moreGeneration of electricity from 3.2 MW capacity wind mills by Gujarat JHM at Bhambarwadi, Maharashtra
Technology
Wind
Renewables

Country
India
Asia

Standard
CDM
Compliance
Stage
Issuance
2013-03-14
Awaiting scheduling
Total issued
12,873
tCO2
Annual Reduction
5,082
tCO2/year
CDM
Scope
| Energy industries |
Additionality
| Tool version : | - |
| Barrier analysis: | yes |
| Investment analysis : | -Other |
Provider ID
| UNEP | cdm2066 |
| UNFCCC | 1540 |
| Methodology | Ver | Description |
| AMS-I.D. | 10 | Grid connected renewable electricity generation |
| AMS-I.D. | 10 | Grid connected renewable electricity generation |
Description
Gujarat JHM Hotels Limited (hereafter referred to as GJHMHL in the subsequent sections of this document) was incorporated in India in 1985 and started its hotel operations in December 1990. The CDM project activity as proposed GJHMHL consists of operating 4 nos wind mills of 0.8 MW capacity each, at Bhambarwadi in Maharashtra. The technology and machines were supplied by Enercon India Ltd. (hereafter referred to as EIL in the subsequent sections of this document) and they have also taken the contract for operating and maintaining the machines for ten years of operation, from the date of commissioning of the machines. The distributed generation of the wind mills of this project activity are as follows:
Owner Total capacity of No. of Wind Capacity of each Date of commissioning
wind mills turbines turbine
Gujarat JHM 0.8 MW 1 0.8 MW 22/03/06
Limited 0.8 MW 1 0.8 MW 29/03/06
- 8 MW 1 0.8MW 28/06/06
- 8 MW 1 0.8 MW 23/09/06
Total 3.2 MW 4 0.8 MW The wind mills of GJHMHL are proposed to generate and supply power to Maharashtra State Electricity Distribution Company Limited (hereafter referred to as MSEDCL). Contribution of the project activity to sustainable development Ministry of Environment and Forests, Govt. of India has stipulated the social well being, economic well being, environmental well being and technological well being as the four indicators for sustainable development in the interim approval guidelines host country approval eligibility criteria for Clean Development Mechanism (CDM) projects1.
Social well being
• Rural and infrastructural development in the areas around the project. • Contribution towards achieving the objective of the policy on wind power generation of Government of India and Government of Maharashtra., which is to promote generation of energy through non-conventional sources to supplement the ever increasing demand of the state.
Environmental well being
• Reduction in the consumption of fossil fuels in the grid for generating additional electricity equivalent to that generated by the wind mills; • CO2 abatement and reduction of green house emission through development of renewable technology.
• The project has reduced the local air pollutants and environmental impacts due to increased share of electricity generation through wind power. Economic well being
• Help in economic development of remote villages in Maharashtra by making investment in that area.
• A number of electric sub stations have come in the area resulting in further employment. • All the turbines need maintenance personnel, which in turn gives employment to local people. • The land prices in the neighbouring area have gone up substantially thereby benefiting the villagers.
Technological well being
• Encourage other entrepreneurs irrespective of sector to adopt this technology and invest in wind energy
Technicals
Investment
$4M
Energy
| Installed capacity | 3.20 MW |
| Effective hours | 1.75k h/year |
| Energy generated | 5.61k MWh/year |
| Utilization ratio | 20 % |
| Activity start date | - |
Time
In validation
: Total elapsed days between “opening comments” and the registration request date.In registration
: Total elapsed days from registration request until approval.To be registered
: Total elapsed days from Validation until Registration approval (Validation + Registration).To first issuance
: Total elapsed days from registration approval until first credit issuance.Total to first issuance
: Sum of entire validation, registration and ‘to first issuance’ days; i.e. the entire process.
| In validation | 252 days |
| In registration | 159 days |
| To be registered | 411 days |
| To first issuance | 935 days |
| Total to first issuance | 1344 days |
Location
4 Organizations (5 roles involvement)
![]() | Participant name | Finance | Credit Buyer | () | Germany | Contact name |
![]() | Participant name | Certification | PDD Consultant | () | United Kingdom | Contact name |
![]() | Participant name | Certification | Validator | () | Germany | Contact name |
![]() | Participant name | Certification | Verifier | () | Germany | Contact name |
![]() | Participant name | Other | Project Owner | () | India | Contact name |
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
Similar Projects
Generation of Electricity from 3.2 MW Capacity Wind Mills by Gujarat JHM Hotels Ltd at Bhambarwadi, MaharashtraVCS | India | Registration
Update : 2012-08-11 14:31:25
Generation of electricity from 2.5 MW capacity wind mills by Gujarat JHM Hotels Pvt. Ltd at Soda Mada RajasthanCDM | India | Issuance
Update : 2013-02-01 01:56:38
Generation of electricity from 12.8 MW capacity wind mills by Avinash Bhosale group at Bhambarwadi, MaharashtraCDM | India | Issuance
Update : 2013-02-26 21:02:05
Generation of electricity from 9.6 MW capacity wind mills by Sun-n-Sand Hotels Pvt. Ltd. at Bhambarwadi, MaharashtraCDM | India | Issuance
Update : 2013-02-19 01:25:00
Generation of electricity from 6.25 MW capacity wind mills by Sun-n-Sand Hotels Pvt. Ltd at Soda Mada RajasthanCDM | India | Issuance
Update : 2013-03-07 14:38:12
Generation of electricity from 1.2 MW capacity wind mills by Sun-n-Sand Hotels Pvt. Ltd. at Satara, MaharashtraCDM | India | Issuance
Update : 2012-12-10 13:53:55
Generation of electricity from 4 MW capacity wind mills by Sun-n-Sand Hotels Pvt. Ltd. at Supa, MaharashtraCDM | India | Issuance
Update : 2012-08-27 11:41:20
Biomass in Rajasthan - Electricity generation from mustard crop residuesCDM | India | Issuance
Update : 2013-02-27 17:04:29
Electricity generation from mustard crop residues: Tonk, IndiaCDM | India | Issuance
Update : 2013-02-26 17:47:45




