Learn moreGancheng 1st Stage Wind Power Project in Dongfang City Hainan Province, China
Technology
Wind
Renewables

Country
China
Asia

Standard
CDM
Compliance
Stage
Issuance
2013-03-14
Awaiting scheduling
Total issued
164,477
tCO2
Annual Reduction
89,203
tCO2/year
CDM
Scope
| Energy industries |
Additionality
| Tool version : | 5.2 |
| Barrier analysis: | no |
| Investment analysis : | -Benchmark Analysis |
Provider ID
| UNEP | cdm5190 |
| UNFCCC | 3528 |
| Methodology | Ver | Description |
| ACM0002 | 9 | Grid-connected electricity generation for renewable sources (no biomass) |
| ACM0002 | 10 | Grid-connected electricity generation for renewable sources (no biomass) |
Description
Gancheng 1st Stage Wind Power Project in Dongfang City Hainan Province, China (hereinafter referred to as “the proposed project”) is located in the coastal zone of Dongfang City in Hainan Province. The proposed project involves the installation of 33 wind turbine generators, each of which has a rated output of 1.5MW, providing a total capacity of 49.5MW. The annual grid-in electricity is estimated to be 103,857 MWh1. The proposed project is constructed and operated by Hainan Xinfengyuan Industrial Co., Ltd (hereinafter referred to as “the project owner”).
Before the implement of the proposed project, there is no any other wind power equipment and system around the proposed project site. The proposed project is a grid-connected wind power station in the coastal zone of Dongfang City. The main structure includes wind power electricity generation units, 10kV box substations and main transformer etc. The electricity generated by the proposed project is connected to Hainan Power Grid through one 110kV circuit. According to the analysis in the following section B.4, in absence of the proposed project, the most feasible baseline scenario is power supplied by Hainan Power Grid. Hainan Power Grid is dominated by fossil fuel-fired power plants, and is developed fast recently. In five years between 2002 and 2006, in annual generation composition, coal-fired generation accounts for 69.14%, 75.38%, 82.73%, 85.00%, and 89.56%2. The baseline emission source is CO2 emission by Hainan Power Grid. As a renewable wind power project, the project emission of the proposed project is zero. After the implement of the proposed project, annual grid-in electricity is estimated to be 103,857MWh, and the annual emission reductions of the proposed project is estimated to be 89,203 tCO2e The proposed project will promote local sustainable development by making use of renewable wind power. Major contributions of the proposed project are as follows:
The proposed project will alleviate the shortage of electricity, improve the power quality of the grid, ensure industrial and household electricity, and promote local economic development. It will reduce the emission of pollutants and greenhouse gases which might otherwise be caused by coal-fired generators so as to improve local environment, such as NOx, SO2, Total Suspended Particles (TSP), etc.
CDM – Executive Board
It will create temporary job opportunity in the construction period and 15 long-term job opportunities during the operation period.
Technicals
Investment
$70M
Energy
| Installed capacity | 49.50 MW |
| Effective hours | 2.10k h/year |
| Energy generated | 103.86k MWh/year |
| Utilization ratio | 23.95 % |
| Activity start date | 2009-03-01 |
Time
In validation
: Total elapsed days between “opening comments” and the registration request date.In registration
: Total elapsed days from registration request until approval.To be registered
: Total elapsed days from Validation until Registration approval (Validation + Registration).To first issuance
: Total elapsed days from registration approval until first credit issuance.Total to first issuance
: Sum of entire validation, registration and ‘to first issuance’ days; i.e. the entire process.
| In validation | 303 days |
| In registration | 182 days |
| To be registered | 485 days |
| To first issuance | 438 days |
| Total to first issuance | 921 days |
Location
5 Organizations (5 roles involvement)
![]() | Participant name | Engineering & Research | PDD Consultant | () | China | Contact name |
![]() | Participant name | Certification | Verifier | () | China | Contact name |
![]() | Participant name | Certification | Validator | () | Germany | Contact name |
![]() | Participant name | Other | Credit Buyer | () | Japan | Contact name |
![]() | Participant name | Industry | Project Owner | () | Contact name |
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
Similar Projects
Gansu Tianrun Liuyuan 1st Stage 49.5MW Wind Park ProjectCDM | China | Issuance
Update : 2013-02-15 06:42:03
Xinjiang Buerjin Tianrun Windpower Co., Ltd. Wind Farm 1st Stage ProjectCDM | China | Issuance
Update : 2013-03-15 12:44:14
Guohua Qiqihaer Fuyu 1st Stage Wind Farm ProjectCDM | China | Issuance
Update : 2013-05-17 16:09:44