Learn moreGEPL Biomass energy generation project at Faridabad, Haryana
Technology
Biomass
Renewables

Country
India
Asia

Standard
CDM
Compliance
Stage
Issuance
2012-04-10
CERs issued
Total issued
30,718
tCO2
Annual Reduction
52,981
tCO2/year
CDM
Scope
| Energy industries |
Additionality
| Tool version : | - |
| Barrier analysis: | yes |
| Investment analysis : | -Other |
Provider ID
| UNEP | cdm2512 |
| UNFCCC | 1492 |
| Methodology | Ver | Description |
| AMS-I.C. | 11 | Thermal energy production with or without electricity |
| AMS-I.C. | 11 | Thermal energy production with or without electricity |
Description
The project activity consists of biomass based energy generation in the textile processing division of Gupta Exim (India) Pvt. Ltd (GEPL) at village Prithla, Tehsil Palwal in Faridabad, Haryana. The project activity is being carried out in two phases. The first phase entails the installation of a boiler to generate steam by combustion of biomass, thereby doing away with the use of coal for process heating, installation of one thermopac for heat generation for stenters and relax drier in the plant. The second phase consists of installation of a cogeneration unit (a new boiler and matching steam turbine are proposed) for the simultaneous production of steam and electricity. The boiler installed in the first phase will be used as a stand by, once the second phase is completed and commissioned.
GEPL, a government recognized export house is part of the multifaceted group, having diversified interests. The company is engaged in the manufacturing and export of knitted cotton and woollen garments. Biomass (rice husk) will be used to generate power and steam for use within the plant premises.
Details of Thermal Electrical Power Equipments in the Remarks Project Activity Energy Project Activity
Steam generation HSEB1 grid Boiler Commissioned in Boiler based on power 01 No. (Boiler No 1) September 2006 Renewable Capacity = 10 TPH
Biomass Pressure = 11.25
kg/cm2 (g)
Temp. = 188 Deg C
Phase I
Heat generation2 HSEB grid Thermopac of 2.0 Commissioned in Thermic Fluid power million kcal/hour September 2006 Heater based on capacity
Renewable
Biomass
Renewable Renewable Boiler Expected
Biomass based Biomass based 01 No. (Boiler No. 2) commissioning by
Capacity = 20 TPH December 2008 Phase II
Pressure = 66 kg/cm2
Temp. = 490 Deg C CDM – Executive Board
Turbine Expected
Capacity = 3 MW commissioning by Type = Extraction- December 2008
condensing turbine3
The project activity reduces greenhouse gas emissions by avoiding fossil fuel combustion in steam and power generation. In the absence of project activity, GEPL would have installed a coal based energy generation unit and/ or continued withdrawal of power from the state grid, which is primarily based on fossil fuel combustion (Project activity is located in the state of Haryana, which is part of Northern Region Grid in India. The Grid Emission Factor of Northern Region Grid is 0.80tCO2e/MWh4). It is a carbon neutral project activity as the greenhouse gases generated during the process are of biogenic origin.
Sustainable Development by the project activity
The project activity will contribute towards the Government of India’s sustainable development criteria in the following manner:
- The project activity will lead to overall development of the region, and will improve the rural economy. The use of biomass will provide an additional source of income for the rural community. Setting up of collection and delivery points will also generate employment for the local people.
- It will generate employment opportunities for the skilled as well as unskilled labour during the construction, and operation phase of the project.
- The project activity would help to reduce the demand-supply gap in power deficit regional grid.
- This will provide necessary impetus for industries to come up with more such projects in the area
- Since the project activity utilizes biomass as fuel, it helps in conservation of natural resources such as coal, natural gas etc.
- The project activity is carbon neutral as the CO2 generated during combustion of fuel is taken up by the biomass for its growth.
- The technology used in the project activity is indigenous and safe. CDM – Executive Board
Technicals
Investment
$4M
Energy
| Installed capacity | 3 MW |
| Effective hours | 7.24k h/year |
| Energy generated | 21.71k MWh/year |
| Utilization ratio | 82.60 % |
| Activity start date | - |
Time
In validation
: Total elapsed days between “opening comments” and the registration request date.In registration
: Total elapsed days from registration request until approval.To be registered
: Total elapsed days from Validation until Registration approval (Validation + Registration).To first issuance
: Total elapsed days from registration approval until first credit issuance.Total to first issuance
: Sum of entire validation, registration and ‘to first issuance’ days; i.e. the entire process.
| In validation | 154 days |
| In registration | 170 days |
| To be registered | 324 days |
| To first issuance | 1273 days |
| Total to first issuance | 1595 days |
Location
4 Organizations (5 roles involvement)
![]() | Participant name | Industry | PDD Consultant | () | India | Contact name |
![]() | Participant name | Industry | Project Owner | () | India | Contact name |
![]() | Participant name | Certification | Validator | () | United Kingdom | Contact name |
![]() | Participant name | Certification | Verifier | () | Germany | Contact name |
![]() | Participant name | Carbon & Environment | Credit Buyer | () | India | Contact name |
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
Similar Projects
GEPL Biomass energy generation project at Faridabad, HaryanaVCS | India | Issuance
Update : 2012-08-11 14:31:25
Renewable biomass based thermal energy generation at Mahalaxmi Group of Companies, AhmedabadCDM | India | Issuance
Update : 2012-11-02 13:57:33
Biomass based thermal energy generation at M/s. Ester Industries limited, Khatima, Uttarakhand, IndiaCDM | India | Issuance
Update : 2012-11-23 15:20:35
Biomass based renewable energy project in a Solvent Extraction Plant, IndiaCDM | India | Issuance
Update : 2012-08-11 14:31:24
Mensilin Holdings Biomass Energy Plant ProjectCDM | Malaysia | Issuance
Update : 2012-08-11 14:31:24
6 MW Renewable energy generation project by Varam Power Projects in IndiaCDM | India | Issuance
Update : 2012-09-28 12:55:24
Fuel switch from fossil fuel to renewable biomass for thermal energy applications in RajasthanCDM | India | Issuance
Update : 2012-09-07 17:51:17
Biomass based steam generation project by Sterling Agro Industries Ltd.VCS | India | Issuance
Update : 2012-08-11 14:31:26
Biomass based renewable energy project in a Solvent Extraction Plant, IndiaVCS | India | Issuance
Update : 2012-08-11 14:31:26