eCO2data is the world's biggest source of information and analytical tools for the carbon market. We provide unbiased information on the most carbon projects and participants.
Learn moreFujian Beijin Hydropower Project
Technology
Hydro
Renewables

Country
China
Asia

Standard
CDM
Compliance
Stage
Issuance
2013-02-08
Request For Issuance
Total issued
502,010
tCO2
Annual Reduction
148,386
tCO2/year
CDM
Scope
| Energy industries |
Additionality
| Tool version : | 3 |
| Barrier analysis: | no |
| Investment analysis : | -Benchmark Analysis |
Provider ID
| UNEP | cdm2248 |
| UNFCCC | 1478 |
| Methodology | Ver | Description |
| ACM0002 | 6 | Grid-connected electricity generation for renewable sources (no biomass) |
| ACM0002 | 6 | Grid-connected electricity generation for renewable sources (no biomass) |
Description
Fujian Beijin Hydropower Project (hereinafter referred as the proposed project) is located in the main stream of Jianxi Stream which is 7km up the urban area of Jian’ou City. It is a low-head pondage hydropower station in river channel, with the total installed capacity of 50MW, and the annual electricity supplied to the grid of 186,650 MWh. The surface area at full reservoir level is 7.33km2 and the power density is about 6.82W/m2. After the proposed project is completed, electricity generated by the proposed project will effectively displace equal amount of the electricity generated by East China Power Grid which is dominated by fossil fuel power plants, and thus greenhouse gas (GHG) emission reductions could be achieved. The estimated annual GHG emission reductions will be 148,386 tCO2e.
The construction of the proposed project is in compliance with the choice of China energy industry’s priority areas, and it will facilitate the sustainable development of the host party country and the local place in the following aspects:
Alleviating the contradiction between demand and supply of local electric power; Creating employment opportunity;
Reducing GHG emission compared with the conventional fossil fuel power; Reducing emission of other pollutants compared with the conventional power generation methods.
Project participants:
Technicals
Investment
$57M
Energy
| Installed capacity | 50 MW |
| Effective hours | 3.73k h/year |
| Energy generated | 186.65k MWh/year |
| Utilization ratio | 42.61 % |
| Activity start date | - |
Time
In validation
: Total elapsed days between “opening comments” and the registration request date.In registration
: Total elapsed days from registration request until approval.To be registered
: Total elapsed days from Validation until Registration approval (Validation + Registration).To first issuance
: Total elapsed days from registration approval until first credit issuance.Total to first issuance
: Sum of entire validation, registration and ‘to first issuance’ days; i.e. the entire process.
| In validation | 181 days |
| In registration | 139 days |
| To be registered | 320 days |
| To first issuance | 590 days |
| Total to first issuance | 908 days |
Location
7 Organizations (7 roles involvement)
![]() | Participant name | Certification | Verifier | () | Japan | Contact name |
![]() | Participant name | Certification | Validator | () | Japan | Contact name |
![]() | Participant name | Carbon & Environment | Participant | () | Portugal | Contact name |
![]() | Participant name | Other | PDD Consultant | () | China | Contact name |
![]() | Participant name | Utility | Project Owner | () | China | Contact name |
![]() | Participant name | Other | Credit Buyer | () | Japan | Contact name |
![]() | Participant name | Certification | Verifier | () | Japan | Contact name |
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
Similar Projects
Fujian Pingnan Houlongxi 48MW Hydropower ProjectCDM | China | Issuance
Update : 2013-02-28 18:50:34
Shunchang Yangkou Hydro Power Project, Fujian, ChinaCDM | China | Issuance
Update : 2013-02-07 12:59:47
Longyou 18 MW Hydropower Project in Zhejiang ProvinceCDM | China | Issuance
Update : 2013-02-26 21:02:05
Sichuan Ya’an Shaping Hydropower Station ProjectCDM | China | Issuance
Update : 2013-03-07 07:42:29