eCO2data is the world's biggest source of information and analytical tools for the carbon market. We provide unbiased information on the most carbon projects and participants.
Learn moreCatalytic N2O Abatement Project in the Tail Gas of the Nitric Acid Plant of the Pakarab Fertilizer Ltd (PVT) in Multan, Pakistan
Technology
N2O
Industrial Processes

Country
Pakistan
Asia

Standard
CDM
Compliance
Stage
Issuance
2013-01-10
Monitoring Report Available
Total issued
3,716,699
tCO2
Annual Reduction
1,050,000
tCO2/year
CDM
Scope
| Chemical industries |
Additionality
| Tool version : | - |
| Barrier analysis: | no |
| Investment analysis : | -Simple Cost Analysis |
Provider ID
| UNEP | cdm0743 |
| UNFCCC | 557 |
| Methodology | Ver | Description |
| AM0028 | 2 | Catalytic N2O destruction in the tail gas of nitric acid or caprolactam production plants |
| AM0028 | Catalytic N2O destruction in the tail gas of nitric acid or caprolactam production plants |
Description
Nitrous Oxide (N2O) is an undesired by-product of the nitric acid (HNO3) production process at the synthetic fertilizer production facility.
In order to produce nitric acid, ammonia (NH3) is oxidized into NO—desired product1—with air on precious metal catalyst gauzes (usually platinum-rhodium alloys) in the ammonia burner of the nitric acid plants. Through this process, some amount of undesired N2 and N2O are formed as the gauzes’ selective capability drop over time.
N2O is not a toxic substance and is not regulated in Pakistan. Therefore, it is released to atmosphere without any recovery or any specific treatment at the targeted facility of the Pakarab Fertilizer Ltd (PVT).
N2O is reduced if non-selective catalytic reduction (NSCR) equipment is introduced in order to reduce NOX emissions. However, the NOX emissions level at the targeted facility is and expected to be below the local regulatory level. Therefore, it does not currently install or has no plan to install NSCR in the foreseeable future.
There is no economic incentive to recover and utilize or sell N2O as a product, technically and economically, except for CERs.
In addition, the project does not result in increasing the HNO3 production. Therefore, without CERs, PVT is going to release N2O emissions under its normal operation (i.e., continuation of the current practice).
Currently, around (82.5 × 2 + 28.0) × 103 Nm3/hr flue gas per line from around 434,000 t HNO3/yr production process (three lines) is emitted. The project is to introduce catalytic DeN2O equipment (Regenerative Catalytic System) at the tail point before release to the atmosphere. The technologies are provided by N.E. Chemcat (catalyst) and Sumiko Eco-Engineering (engineering). It is expected that the equipment can decompose more than 90% of the N2O, which would be emitted otherwise.2
The project also installs DeNOX equipment (SCR-type) and reduces most of the NOX emissions as well, although it is not necessary because the host company complies with the NOX regulation and would be continued to comply with it.
In addition to reduce N2O emissions, the project transfers a clean technology which is not yet widely commercialized even in industrialized countries. It also includes the training course for operation of the DeN2O equipment and also for accurate monitoring. The local employment will be created through the direct/indirect economical effects through the project activity.
Technicals
Investment
$0
Energy
| Installed capacity | 0 MW |
| Effective hours | - |
| Energy generated | 0 MWh/year |
| Utilization ratio | 0 % |
| Activity start date | - |
Time
In validation
: Total elapsed days between “opening comments” and the registration request date.In registration
: Total elapsed days from registration request until approval.To be registered
: Total elapsed days from Validation until Registration approval (Validation + Registration).To first issuance
: Total elapsed days from registration approval until first credit issuance.Total to first issuance
: Sum of entire validation, registration and ‘to first issuance’ days; i.e. the entire process.
| In validation | 133 days |
| In registration | 59 days |
| To be registered | 192 days |
| To first issuance | 564 days |
| Total to first issuance | 754 days |
Location
6 Organizations (6 roles involvement)
![]() | Participant name | Carbon & Environment | PDD Consultant | () | Japan | Contact name |
![]() | Participant name | Certification | Verifier | () | Norway | Contact name |
![]() | Participant name | Certification | Validator | () | Germany | Contact name |
![]() | Participant name | Industry | Project Owner | () | Pakistan | Contact name |
![]() | Participant name | Finance | Credit Buyer | () | Russia | Contact name |
![]() | Participant name | Other | Credit Buyer | () | Japan | Contact name |
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
Similar Projects
Catalytic N2O Abatement Project in the Tail Gas of the Nitric Acid Plant of the Hanwha Corporation (HWC) in Ulsan, Republic of KoreaCDM | Korea South | Issuance
Update : 2013-03-12 19:26:01
Catalytic N2O destruction project in the tail gas of the nitric acid plant PANNA 3 of Enaex S.A.CDM | Chile | Issuance
Update : 2013-03-13 11:44:39
Catalytic N2O destruction project in the tail gas of the Nitric Acid Plant of Abu Qir Fertilizer Co.CDM | Egypt | Issuance
Update : 2013-03-08 13:47:39
Catalytic N2O Abatement Project in the tail gas of the Caprolactam production plant in ThailandCDM | Thailand | Issuance
Update : 2013-03-08 15:58:19
Anhui Huainan Chemical N2O Abatement Project at Nitric Acid Plant Line4CDM | China | Issuance
Update : 2013-05-09 17:47:06
Catalytic N2O abatement project in the tail gas of the nitric acid production plant in G.F.C, SyriaCDM | Syrian Arab Republic | Registration
Update : 2012-08-11 14:31:25
Project for the catalytic reduction of N2O emissions with a secondary catalyst inside the ammonia reactor of the nitric acid plant at Fertilizers & Chemicals Ltd., Haifa, IsraelCDM | Israel | Issuance
Update : 2013-03-04 00:03:52
Catalytic N2O destruction project in the tail gas of three Nitric Acid Plants at Hu-Chems Fine Chemical Corp.CDM | Korea South | Issuance
Update : 2013-03-05 20:23:48
Catalytic N2O Abatement Project in the Tail Gas of the Nitric Acid Plant of the Hanwha Corporation (HWC) in Ulsan, Republic of KoreaCDM | Korea South | Starting
Update : 2012-08-11 14:31:24






