eCO2data is the world's biggest source of information and analytical tools for the carbon market. We provide unbiased information on the most carbon projects and participants.
Learn moreBiomass based renewable energy project in a Solvent Extraction Plant, India
Technology
Biomass
Renewables

Country
India
Asia

Standard
CDM
Compliance
Stage
Issuance
2012-01-05
CERs issued
Total issued
38,378
tCO2
Annual Reduction
25,140
tCO2/year
CDM
Scope
| Energy industries |
Additionality
| Tool version : | - |
| Barrier analysis: | yes |
| Investment analysis : | -Other |
Provider ID
| UNEP | cdm0911 |
| UNFCCC | 1221 |
| Methodology | Ver | Description |
| AMS-I.C. | 8 | Thermal energy production with or without electricity |
| AMS-I.C. | 9 | Thermal energy production with or without electricity |
Description
The project activity entails use of renewable biomass for thermal and electrical energy generation at Ambika Solvex Ltd. (ASL). ASL operates a solvent extraction plant, extracting crude oil from Soya seeds. Prior to project activity, steam was generated in a boiler based on coal and electricity demand was met from the Madhya Pradesh State Electricity Board (MPSEB), which is part of Western Region (WR) grid in India.
The project activity is taken up in two phases. In first phase, the project activity entails combusting renewable biomass in a newly installed boiler for steam generation and thus doing away with the use of coal. In second phase, one back pressure turbine would be installed to meet the electricity demand in the plant. One additional boiler will be installed to run the turbine at rated capacity. The existing two boilers 3TPH (Regn. no. MP 4267) & 6TPH (Regn no. MP 4528) are kept as stand by units, while one boiler 6TPH (Regn. No. MP 4173) is scrapped.
The project activity would result in emission reductions in following two ways –
Avoiding coal combustion in steam generation with biomass based steam Displacement of Grid Power, which is primarily based on fossil fuel combustion with biomass based power
Pre-project Status:
Steam Generation Power generation Boiler data
Coal Based MPEB grid power Capacity =
3 TPH- 1 No.,
6 TPH- 1 No.
Pressure = 17.5 kg/cm2
Temperature = 209 Deg C
Post-project Status:
Phase Steam Power Equipments Timeline
Generation generation proposed
Phase I of project Renewable MPEB grid Boiler No.1 Commissioned in
activity Biomass Based power Capacity = 10 TPH April 2006
(Regn no. MP 4620)
Pressure = 45 kg/cm2
Temp. = 450 Deg C
Phase II of Renewable Renewable Boiler No. 2 Expected to be project activity Biomass based Biomass based Capacity = 16 TPH commissioned by
Pressure = 45 kg/cm2 March 2008 Temp. =450 Deg C
Turbine
Capacity = 1.2 MW Expected to be Type = Back pressure commissioned by turbine Sep. 2007
The project activity faces a number of investments & operational barriers and project proponent envisage coming up with the project activity despite the barriers and back this up with CDM based revenues.
Sustainable development by project activity:
The project activity helps in the sustainable development on many counts.
- It helps in reduction in Green House Gases (GHG) emissions in steam and power generation.
- It also helps in conservation of natural resources i.e. coal
- The project activity creates employment opportunities during the project stage and operation and maintenance of the plant.
- Use of biomass residues in the region has provided a distinct source of revenue to the people in
- This will provide necessary impetus for industries to come up with more such projects in the area.
- The project will encourage technology providers in putting more R&D efforts and funds towards new technology development.
Technicals
Investment
$0
Energy
| Installed capacity | - |
| Effective hours | - |
| Energy generated | 0 MWh/year |
| Utilization ratio | 0 % |
| Activity start date | - |
Time
In validation
: Total elapsed days between “opening comments” and the registration request date.In registration
: Total elapsed days from registration request until approval.To be registered
: Total elapsed days from Validation until Registration approval (Validation + Registration).To first issuance
: Total elapsed days from registration approval until first credit issuance.Total to first issuance
: Sum of entire validation, registration and ‘to first issuance’ days; i.e. the entire process.
| In validation | 353 days |
| In registration | 114 days |
| To be registered | 467 days |
| To first issuance | 1395 days |
| Total to first issuance | 1860 days |
Location
4 Organizations (5 roles involvement)
![]() | Participant name | Food | PDD Consultant | () | India | Contact name |
![]() | Participant name | Food | Project Owner | () | India | Contact name |
![]() | Participant name | Finance | Participant | () | Switzerland | Contact name |
![]() | Participant name | Certification | Validator | () | United Kingdom | Contact name |
![]() | Participant name | Certification | Verifier | () | Germany | Contact name |
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
Similar Projects
Biomass based renewable energy project in a Solvent Extraction Plant, IndiaVCS | India | Issuance
Update : 2012-08-11 14:31:26
Biomass based renewable energy project of M/s. Sharda Solvent Ltd. in a Solvent Extraction Plant, Kota, RajasthanCDM | India | Starting
Update : 2012-08-11 14:31:24
Rice husk based cogeneration plant (5 MW) at Shibzada Ajit Singh Nagar District, Punjab by M/s Nahar Industrial Enterprises limitedCDM | India | Issuance
Update : 2012-08-11 14:31:24
Biomass based renewable energy project of Ambika Solvex Ltd. in a Solvent Extraction Plant, Kalapipal, Madhya PradeshCDM | India | Starting
Update : 2012-08-11 14:31:25
Renewable biomass based thermal energy generation at Mahalaxmi Group of Companies, AhmedabadCDM | India | Issuance
Update : 2012-11-02 13:57:33
Fuel switch from fossil fuel to renewable biomass for thermal energy applications in RajasthanCDM | India | Issuance
Update : 2012-09-07 17:51:17
10 MW Biomass Based Renewable Energy Generation for the Grid at Saradambika Power Plant Private Limited at Chandrapur District, MaharashtraCDM | India | Issuance
Update : 2012-12-27 14:51:15
Biomass Based Cogeneration at a solvent extraction plant in Uttar PradeshCDM | India | Starting
Update : 2012-08-11 14:31:24
ISA Power 8 MW (Gross) Renewable Sources Biomass Power ProjectCDM | India | Issuance
Update : 2012-12-14 21:13:15
Ecofren Power 8 MW Renewable Sources Biomass Power ProjectCDM | India | Issuance
Update : 2013-05-17 16:09:44