eCO2data is the world's biggest source of information and analytical tools for the carbon market. We provide unbiased information on the most carbon projects and participants.
Learn moreBeijing Energy Huolinhe B First Phase 49.5MW Wind Farm Project
Technology
Wind
Renewables

Country
China
Asia

Standard
CDM
Compliance
Stage
Issuance
2012-11-28
CERs issued
Total issued
218,607
tCO2
Annual Reduction
124,262
tCO2/year
CDM
Scope
| Energy industries |
Additionality
| Tool version : | 5.2 |
| Barrier analysis: | no |
| Investment analysis : | -Benchmark Analysis |
Provider ID
| UNEP | cdm3458 |
| UNFCCC | 3136 |
| Methodology | Ver | Description |
| ACM0002 | 7 | Grid-connected electricity generation for renewable sources (no biomass) |
| ACM0002 | 10 | Grid-connected electricity generation for renewable sources (no biomass) |
Description
The Beijing Energy Huolinhe B First Phase 49.5MW Wind Farm Project (hereafter refers to the proposed project) is to utilize wind resources for electricity generation through the construction of a wind farm with a total capacity of 49.5MW and a 66kV transmission station at the southwest of Huolinhe City, Tongliao City, Inner Mongolia Autonomous Region, P.R. China. The proposed project involves the installation of 33 wind turbines with capacities of 1500 kW each, which amount to a total installed capacity of 49.5MW.The electricity generated from the project will be supplied to the Northeast China Power Grid. The estimated annual net electricity output and emission reductions of the proposed project are 108,440MWh and 124,262tCO2e, respectively. The proposed project is a grid-connected renewable energy project.
The proposed project makes contribution to the local sustainable development as follows:
- GHG emission reduction
- Pollutants emission reduction through replacing fossil fuel combustion The proposed project is to reduce grid-connected fossil fuel-fired power plants in the Northeast China Power Grid, and thus reduce fossil fuel consumption and avoid pollutants emission, such as sulfur dioxide and dust, brought by fossil fuel combustion. Therefore, the proposed project has obvious environmental benefit.
- Employment opportunities
The proposed project activity will achieve greenhouse gas (GHG) emission reductions by reducing CO2 emissions, as grid-connected fossil fuel-fired power dominates in the Northeast China Power Grid.
The conducting of the proposed project will offer job opportunities for local people, the estimated job created in construction period and the operational period are about 4 hundred and 35, respectively. The temporary work includes assembly and installation of the wind turbines and the long-term work can be the maintenance of the facilities, etc.
Technicals
Investment
$62M
Energy
| Installed capacity | 49.50 MW |
| Effective hours | 2.19k h/year |
| Energy generated | 108.44k MWh/year |
| Utilization ratio | 25.01 % |
| Activity start date | - |
Time
In validation
: Total elapsed days between “opening comments” and the registration request date.In registration
: Total elapsed days from registration request until approval.To be registered
: Total elapsed days from Validation until Registration approval (Validation + Registration).To first issuance
: Total elapsed days from registration approval until first credit issuance.Total to first issuance
: Sum of entire validation, registration and ‘to first issuance’ days; i.e. the entire process.
| In validation | 611 days |
| In registration | 207 days |
| To be registered | 818 days |
| To first issuance | 757 days |
| Total to first issuance | 1573 days |
Location
6 Organizations (6 roles involvement)
![]() | Participant name | Certification | Verifier | () | China | Contact name |
![]() | Participant name | Carbon & Environment | PDD Consultant | () | China | Contact name |
![]() | Participant name | Finance | Credit Buyer | () | Netherlands | Contact name |
![]() | Participant name | Certification | Validator | () | Japan | Contact name |
![]() | Participant name | Finance | Credit Buyer | () | United Kingdom | Contact name |
![]() | Participant name | Carbon & Environment | Project Owner | () | China | Contact name |
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
This page has restricted access, it is only available to premium subscribers.
Need this information ? Sign-up for a premium account or buy the detailed report on this page.
Premium Account
Dedicated Reports
Similar Projects
Beijing Energy Huitengxile 49.5MW Wind Power ProjectCDM | China | Issuance
Update : 2012-10-29 15:03:29
Huaneng Tuokexun Baiyanghe First Stage 49.5MW wind farm projectCDM | China | Issuance
Update : 2013-03-18 14:51:42
Guohua Binzhou Zhanhua 49.5MW Wind Farm Project (Phase 1)CDM | China | Issuance
Update : 2013-03-15 12:44:13
Inner Mongolia Huade 49.5MW Wind Farm Phase I ProjectCDM | China | Issuance
Update : 2012-12-11 18:15:18
Guohua Wulate Zhongqi Phase I 49.5 MW Wind farm ProjectCDM | China | Issuance
Update : 2012-08-11 14:31:24
Huadian Kailu Yihetala Phase one 49.5 MW Wind Farm ProjectCDM | China | Issuance
Update : 2013-05-25 08:28:24
Liaoning Changtu Taiyangshan Phase One 49.5MW Wind Farm ProjectCDM | China | Issuance
Update : 2013-05-25 08:28:24
Ningxia Taiyangshan Wind Farm Second Phase 49.5MW ProjectCDM | China | Issuance
Update : 2012-08-11 14:31:25




